Your singil sa ilaw arrives every month and you wince. If you have solar panels — or you're about to install them — net metering Philippines is the program that turns your rooftop into a billing weapon. Surplus power flows back to Meralco. Credits offset what you owe. Some households genuinely hit near-zero. Here's the exact process for 2026, no padding.
- Net metering lets you export unused solar power back to Meralco and earn bill credits
- Credits are calculated at the prevailing generation charge — roughly PHP 5–7/kWh in 2026
- Maximum system size: 100 kW for residential and commercial applicants
- End-to-end timeline from submission to go-live: 30–60 days
- The application is free — a good installer handles most of the paperwork
Ano ba ang Net Metering? (And Why Your Kuryente Bill Could Drop to Near-Zero)
Net metering is a billing arrangement under the Renewable Energy Act of 2008 and ERC Resolution No. 1, Series of 2023. When your solar panels produce more than your home is consuming, the surplus flows into the Meralco grid. A bidirectional meter logs what you export, and Meralco credits that amount at the prevailing generation charge — roughly PHP 5–7/kWh — against what you pull from the grid. In the Visayas, VECO runs the same ERC-mandated framework; forms differ, process is identical.

Paano Mag-Apply: The Exact Steps (Meralco 2026)
Plan for 30–60 days from submission to go-live. Every day you delay is another billing cycle you're not earning credits.
-
1
Confirm your system is grid-tied and export-enabled. Your inverter must be in export mode. The installer must also hold active DOE or ERC accreditation — verify this before you sign any contract. It cannot be fixed after the fact.
-
2
Prepare your documents. You need five things: Certificate of Electrical Inspection (CEI) from an accredited electrical engineer, Single-Line Diagram of your solar system, DOE accreditation certificate of your installer, a valid government ID, and your latest Meralco bill. The CEI is the one people forget. Missing it adds weeks.
-
3
Submit the net metering application form (currently Form NA-1 — confirm the latest version on the Meralco customer portal before printing) at your nearest Meralco Business Center or online. VECO and other DUs have equivalent forms.
-
4
Meralco conducts a site inspection. Allow 15–30 business days after a complete submission. An incomplete application resets the clock.
-
5
Bidirectional meter installation. Meralco schedules and installs the two-way meter at no cost to you. Just be available for access.
-
6
Sign the Net Metering Service Agreement (NMSA). Read the credit carryover and 12-month settlement clauses — those terms matter when you size your system.
-
7
Go live. Your system starts exporting on the very next billing cycle. Open your bill — the credit line is your rooftop paying you back.

Magkano ang Maiipon Mo? Real Numbers for Philippine Homes
A typical Metro Manila scenario: a 5 kWp grid-tied system generating 600 kWh/month. The household uses 400 kWh, exports 200 kWh. At PHP 6/kWh, that's PHP 1,200/month in bill credits — plus PHP 2,400+ already saved on self-consumption. Combined monthly impact: PHP 3,600+ in effective savings. To maximize credits, right-size your system to your actual consumption — not your aspirational usage.
Credits roll over — they don't expire at the end of each billing period. They are not paid out as cash. After 12 billing months, any remaining balance is settled at the avoided cost rate, which is lower than the generation charge you earned during the year. A consistently over-exporting system bleeds value at settlement.
Net Metering vs. Off-Grid vs. Zero-Export Hybrid
A common decision point before installation — here's how the three setups compare on what actually matters:
| Net Metering | Off-Grid | Zero-Export Hybrid | |
|---|---|---|---|
| Bill credits | Yes — at generation charge rate | No (no grid bill) | No |
| Grid connection | Required | Not needed | Required |
| ERC qualification | Yes | No | No — export must be enabled |
| Best for | Grid-connected homes cutting monthly bills | Remote properties with no grid access | Backup power focus, no export intent |
Common Reasons Applications Get Rejected (And How to Avoid Them)
"The application is free. The only cost is your time — and a good installer handles most of the paperwork."
- Installer not ERC/DOE accredited. Kills the application outright. Verify before signing the installation contract.
- System size exceeds 100% of contracted demand. Size against your billing history, not aspirationally.
- Incomplete documents at submission. A missing CEI is the single biggest cause of delay. Prepare everything before you walk in.
- System in non-export mode. Off-grid setups and hybrids with export disabled don't qualify.

Net metering in 2026 is free to apply for, well-regulated, and genuinely effective at cutting your monthly kuryente bill. The barrier isn't the process — it's choosing an accredited installer who prepares documents correctly. Get that right and the rest follows.
Frequently Asked Questions
How long does Meralco net metering approval take in 2026?
From a complete submission: 30–60 days end-to-end, with the site inspection alone running 15–30 business days. The most common delay is missing documents — have everything ready before you file.
Can I apply for net metering if I have a battery storage system?
Yes — but only if your hybrid inverter is configured in export mode. Systems set to zero-export don't qualify because Meralco sees no generation flowing back to the grid.
What happens to unused net metering credits at the end of the month?
Credits roll over to the next billing cycle with no monthly expiry. After 12 billing months, any remaining balance is settled at the avoided cost rate — lower than the generation charge — which is exactly why right-sizing your system matters.
Ready to Find Out If Net Metering Makes Sense for Your Home?
Get a free solar assessment from LakaSolar — we'll calculate your export potential, right-size your system, and handle the Meralco paperwork from day one.
Get My Free Solar Assessment →Last updated October 2026. Meralco processing timelines, ERC rates, and form names are subject to change — confirm current details with your Distribution Utility or accredited solar installer before submitting.