Your singil sa ilaw lands every month and you wince. You've got solar panels on the roof — or you're close to putting them there — and you've heard Meralco will actually credit you for power your home doesn't consume. That's net metering. It's real, ERC-mandated, and in 2026, applying for net metering in the Philippines is more straightforward than most homeowners expect.
- Net metering credits every kWh you export to the grid against your Meralco bill
- ERC rules allow up to 100kWp for residential and commercial customers
- Most Meralco homeowners cut bills by 60–90% — some months hit PHP 0
- Application takes 30–60 days after submitting complete documents
- One-time bidirectional meter cost: roughly PHP 3,500–5,000
Ano ang Net Metering? (And Why Your Kuryente Bill Could Drop to Zero)
Net metering connects your solar system to the grid via a bidirectional meter. When your panels generate more than your home uses, surplus flows to the grid — and you earn a credit for every kilowatt-hour of it. That credit appears on your next bill directly. No rebate forms, no waiting.
Under Energy Regulatory Commission (ERC) rules, residential and commercial customers can install systems up to 100 kilowatt-peak (kWp) and qualify through their Distribution Utility — Meralco for Metro Manila and surrounding provinces, Visayan Electric (VECO) for Cebu. One hard requirement: your installer must meet DOE accreditation standards. No accreditation, no application accepted.

Paano Mag-Apply: The 2026 Step-by-Step Checklist
Five steps. Miss one and the clock resets.
Non-negotiable. Meralco will not process an application from an unaccredited installer. Confirm accreditation before signing anything — our solar panel installation guide breaks down exactly what a qualified install involves and what to verify before you commit.
Gather: Meralco account number, Certificate of Completion from your installer, Single-Line Diagram, and your latest electric bill. Businesses add SEC or DTI registration. One missing item delays the entire queue.
Meralco customers apply at meralco.com.ph/online-services or any Business Center. VECO customers go directly to Visayan Electric. Write down your application reference number immediately — it's the only proof the clock is running.
Meralco schedules a visit within 30 days of a complete submission. A technician checks your system setup and inverter wiring. Have your installer on-site — questions get answered faster, approvals move quicker.
Meralco replaces your existing meter with a bidirectional unit that tracks both consumption and export. One-time cost: PHP 3,500–5,000. Your first bill after installation already reflects exported credits.
Meralco vs. VECO: Quick Comparison
| Meralco | VECO (Visayan Electric) | |
|---|---|---|
| Coverage | Metro Manila + surrounding provinces | Cebu City + Visayas region |
| Submission | Online portal or Business Center walk-in | In-person at VECO office |
| System cap | 100 kWp | 100 kWp |
| Inspection timeline | Within 30 days of complete submission | Varies — contact VECO directly |
| Meter upgrade cost | PHP 3,500–5,000 (one-time) | Contact VECO for current rate |
Sulit Ba? What to Expect After Approval

Once your bidirectional meter goes live, every kilowatt-hour you export earns a credit at the blended generation rate — roughly PHP 5–7 per kWh in 2026. As of current Meralco billing policy (per ERC Resolution No. 09-2013), credits roll forward each month and any unused balance at the annual true-up is paid out in cash — confirm the specific payout timing with Meralco for your billing cycle, as mechanics can vary.
The math on a typical setup: a 5kWp residential system in Metro Manila exporting around 150 kWh per month earns PHP 750–1,050 in monthly credits. For many smaller households, that's the full bill — gone. Use our solar savings calculator to run your own numbers against your actual consumption before settling on a system size.
"Net metering credits carry forward monthly — as of 2026 Meralco billing policy, your remaining annual balance is paid out in cash at true-up."
ERC Resolution No. 09, Series of 2013 requires your DU to process a complete application within a defined period. Documents in order? Meralco cannot sit on your application. The clock runs on them, not you.

Ready to Go Solar? Here's Your Next Step
The fastest path through this process is working with an installer who already knows it cold. LakaSolar handles the entire net metering application — DOE-accredited installation, Meralco submission, document prep, and inspection coordination. You show up on activation day.
Frequently Asked Questions
How long does Meralco net metering approval take in 2026?
Expect 30–60 days from complete document submission, covering site inspection and bidirectional meter installation. Incomplete submissions reset the clock entirely.
Magkano ang bayad to apply for net metering?
No application fee from Meralco. You pay for the bidirectional meter upgrade — typically PHP 3,500 to PHP 5,000, one-time, usually folded into the installation package.
Can businesses apply for net metering in the Philippines?
Yes. Residential and commercial customers both qualify under ERC rules up to 100kWp. Businesses include SEC or DTI registration alongside the standard document set.
Maaari ko bang ilipat ang net metering account kung lumipat ako ng bahay?
Net metering is tied to the service address. The new owner inherits the agreement — you file a fresh application at your next address. An active net metering setup is a genuine selling point worth noting in any property negotiation.
Net metering is an ERC-mandated program. DOE-accredited system, complete documents — Meralco must process your application. The savings are real. The process is finite. Start it.
Start cutting your kuryente bill — get a no-obligation solar quote today.
Get a Free Solar QuoteQuick Savings Estimate
Get a Free Quote
Custom system design




